MET (MISSION ELAPSED) T+142:08:24:19
UTC REFERENCE 2026-319 // 14:32:08.411
Payload Mass OK
460 / 22,800 kg
Power Margin +165 W
+165 W net
Project Budget $192.0M
$192.0M / $250.0M
Data Throughput OK
47.0 Mbps (req: 10)
DSN Link Margin +23.4 dB
+23.4 dB (Goldstone)

Target Trajectory Profile

Current orbit and planned path overview for NASA LSP deployment.

Altitude: 500.0 km Inclination: 51.6° Period: 94.6 min
Payload Outfitter 5 Equipped
Mathematical Predicted Trajectory Runge-Kutta 4 Astrodynamics Propagator
ΔV Req: 150 m/s | Nodes: 02 | Prop: Nominal